{"id":735,"date":"2016-03-18T08:49:26","date_gmt":"2016-03-18T08:49:26","guid":{"rendered":"http:\/\/eden-iss.net\/?p=735"},"modified":"2016-03-21T20:02:19","modified_gmt":"2016-03-21T20:02:19","slug":"design-review-meeting","status":"publish","type":"post","link":"https:\/\/eden-iss.net\/index.php\/2016\/03\/18\/design-review-meeting\/","title":{"rendered":"Design review meeting"},"content":{"rendered":"<p>One year after the Kick-off meeting, the EDEN ISS consortium met for the Design review meeting on March 16-17 at the DLR Institute of Space System in Bremen. All project partners, an EU official and members of the scientific advisory board for\u00a0the project attended the meeting.<\/p>\n<div id=\"attachment_837\" style=\"width: 1034px\" class=\"wp-caption alignnone\"><img aria-describedby=\"caption-attachment-837\" loading=\"lazy\" class=\"size-large wp-image-837\" src=\"http:\/\/eden-iss.net\/wp-content\/uploads\/IMG_6036_modified-1024x562.jpg\" alt=\"Group photo\" width=\"1024\" height=\"562\" srcset=\"https:\/\/eden-iss.net\/wp-content\/uploads\/IMG_6036_modified-1024x562.jpg 1024w, https:\/\/eden-iss.net\/wp-content\/uploads\/IMG_6036_modified-300x165.jpg 300w, https:\/\/eden-iss.net\/wp-content\/uploads\/IMG_6036_modified-768x421.jpg 768w, https:\/\/eden-iss.net\/wp-content\/uploads\/IMG_6036_modified-150x82.jpg 150w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p id=\"caption-attachment-837\" class=\"wp-caption-text\">Group photo<\/p>\n<\/div>\n<p>The project members used the two meeting days to present their work of the last year to the whole team and the advisory board. The presentations were followed by an open discussion of design issues, interfaces and operational questions. Each project partner also illustrated their work plan for the months ahead.<\/p>\n<p>The upcoming start of the assembly and integration phase of the container greenhouse in September was another central topic of the meeting.<\/p>\n<p>You can find more photos in our <a href=\"http:\/\/eden-iss.net\/index.php\/2016\/03\/21\/critical-design-review\/\">gallery section<\/a>.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>One year after the Kick-off meeting, the <a href=\"https:\/\/eden-iss.net\/index.php\/2016\/03\/18\/design-review-meeting\/\"> <span class=\"meta-nav\">[+]<\/span><\/a><\/p>\n","protected":false},"author":5,"featured_media":837,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0},"categories":[3],"tags":[72,59,61,69],"_links":{"self":[{"href":"https:\/\/eden-iss.net\/index.php\/wp-json\/wp\/v2\/posts\/735"}],"collection":[{"href":"https:\/\/eden-iss.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eden-iss.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eden-iss.net\/index.php\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/eden-iss.net\/index.php\/wp-json\/wp\/v2\/comments?post=735"}],"version-history":[{"count":5,"href":"https:\/\/eden-iss.net\/index.php\/wp-json\/wp\/v2\/posts\/735\/revisions"}],"predecessor-version":[{"id":838,"href":"https:\/\/eden-iss.net\/index.php\/wp-json\/wp\/v2\/posts\/735\/revisions\/838"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eden-iss.net\/index.php\/wp-json\/wp\/v2\/media\/837"}],"wp:attachment":[{"href":"https:\/\/eden-iss.net\/index.php\/wp-json\/wp\/v2\/media?parent=735"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eden-iss.net\/index.php\/wp-json\/wp\/v2\/categories?post=735"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eden-iss.net\/index.php\/wp-json\/wp\/v2\/tags?post=735"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}